HOME > Construction Cases > [Rooftop] Removal of asphalt compound

[Rooftop] Removal of asphalt compound

Application:

Removes residues of compound or primer after water-proof asphalt layer removed.

Removes residues of compound or primer after clearance of water-proof asphalt layer.

Preparation Method:

Removes the residues of asphalt compound (thickness: 1.0mm) and primer penetrated on concrete surface.

Removes the residues of asphalt compound (thickness: 1.0mm) and primer penetrated on concrete surface.

Apply cutter with:

Ultra Cup  GOLD
NEO Ultra

Performances:

  • 5~10m²/hour;
  • 4~5hrs/piece
  • *** The working performance or the cutter consumption may be carrying out differently according to the conditions of flooring materials, floor hardness, adhesiveness and etc at the job sites. ***

Hint/Clue:

In summertime, the soft compound will easily stick on cutter edge and will extremely decline the performance of handy grinder.

test@linax.co.jp